Full Video Training package For Protection Engineers

Full Video Training package For Protection Engineers

All our training courses (DIGSI 4, DIGSI 5, ETAP, PSCAD, IEC 61850, PCM 600, MiCom, Testing & Comissioning, generator prtection) are gathered in this package. So You can save your money by having all courses in one pack.

  • Trainer: Dr. Saeed Roostaee (Profile on Linkedin)
  • Pre-recorded videos
  • Supplementary Files
  • lifetime access
  • The training link and activation number will be sent to your email immediately after payment.

Click on each course for complete details, please feel free to contact us.

Product Detail:

PRICES https://protectionrelay.com/payment-2/

To download, contact us:

ABB PCM600 Training

ABB Relion 600 series have a wide range of applications. PCM 600 is the software to config these relays. If you want to be a professional in the protection system, I suggest you learn ABB relay manuals and configuration software. 

We’ve also gathered important related files/videos to help you with your time-saving & convenience. For this course, you require to complete the DIGSI 5 and IEC 61850 training first because they are prerequisite Lessons for understanding this topic.

PCM 600 Video Training

  • Language: English
  • Duration: 4 hours main course + hours of supplementary files
  • Trainer: Dr. Saeed Roostaee (Profile on Linkedin)
  • Prerequisite: DIGSI 5 and IEC 61850 training
  • Supplementary Files (.pcmi files / video / pdf/ PCM 600/ connectivity package …)
  • Certificate of Completion

Main Training:

ABB PCM 600 training by Dr. Saeed Roostaee (4 hours)

  • Part 1: ABB relays history, PCM and connectivity pack installation, create project structure based on IEC 61850, different ways to add IEDs (ABB and non-abb relays), different steps to config a relay without reconfiguration and with reconfiguration, how to use Xrio format to set the parameters
  • Part 2: hardware configuration, config analog inputs (voltage and current), application configuration, function blocks and naming based on IEC 61850 standard, IEC symbol, and ANSI code, config a simple overcurrent function,
  • Part 3: config a simple distance protection function (SMAI, SMBI, SMBO, ZMMAPDIS, ZMMPDIS, FUFSPVC, …), configure sample signals based on the 7SA diagram (diagram is discussed and configured in the DIGSI 5 training pack)
  • Part 4:config a simple 67N protection function, config disturbance reports (ARDAR, BRDAR, LED)
  • Part 5: Parameter settings, XRIO format
  • Part 6: product guide for a pre-configured distance relay, and ordering, modifying pre-configured distance relay based on our projects, Analog inputs (current &s for voltage), Distance Protection functions, and Communication logic
  • Part 7: Current and Voltage protection functions and Earth Fault Protection Communication logic, Circuit Breaker Autorecloser and Tripping logics, Signal Logic and General IED functions, Virtual Binary inputs and outputs, Disturbance report analog and binary inputs

Supplementary & Pre-requisites Files:

Demo Videos

For more info, please contact us:

Our Other Completed pieces of training:

Signal Matrix tool [PCM600]

  1. Right-click on IED and select Signal Matrix

2. now we will export selected (Binary inputs/ Binary outputs/ Analog inputs/ goose receive) to excel

3. collapse all rows/ columns and expand all rows/ columns

4. General filter and particular row/ column filter

5. You can change the user-defined for particular selected inputs/output of type binary/analog by clicking on properties and changing the name.

6. Map some goose receive signals by double click, create a connection between selected columns and rows.

7. Double click on the existing connection will disconnect the existing connection between the selected column and row.

8. Some redo and undo.

9. Try to find some signal using find. Find will Highlight the signal where it is.

10. Double click on a particular group of items in any rows or columns to hide or show.

11. Create an inverted signal in Binary outputs/inputs

12. You can see a Glue logic inverter created because of mapping “I” in the signal matrix.

13. flip column text to horizontal/ vertical for binary inputs/ binary outputs/analog inputs/goose receive

These pictures are part of our supplementary files for ABB PCM 600 training that is mixed with Oral explanations to help you understand this course. These auxiliary files have been gathered and attached to our ABB PCM600 training course, you can get more information by

Contact us :

Our completed Courses:

Migrate configuration [Migrate configuration tool] [PCM600 2.6]

  1. To migrate the IED version, Right-click on IED & select Migrate Configuration. IED Version Initial before MIgration: 1.2.3
  2. Let us migrate the IED version to 1.1.01

3. Click Continue to migrate. Undo is not possible in between or end of the migration. The old configuration will be backed up in the path…\PCMDataBases|PCMBackup

4. migration details will popup showing what are the changes that will be made in the migration process like function or hardware version/reversion changes or removed or not available.

5. click Next to proceed further

6. Migration process started, Progress bar showing the details, what are the steps taken in the migration process is also shown.

7. Shoe IED Configuration migration report is selected by default. Click Finish now.

8. Migration report will tell u, Worksheet Name, Type, Name, and what happened during migration u can save this report by clicking on the save icon for further reference.

9. open the Migration Report which is saved as a PDF

These pictures are part of our supplementary files for ABB PCM 600 training that is mix with Oral explanations to help you in the best way of understanding this course. These auxiliary files have been gathered and attached to our ABB PCM600 training course, you can get more information by

Contact us: